Title | Preliminary study of a closed loop vertical ground source heat pump system for an experimental pilot plant (Rome, Italy) |
---|---|
Publication Type | Articolo su Rivista peer-reviewed |
Year of Publication | 2021 |
Authors | Violante, A.C., Proposito Marco, Donato F., Guidi G., and Falconi Luca |
Journal | Renewable Energy |
Volume | 176 |
Pagination | 415-422 |
ISSN | 09601481 |
Abstract | A system for capturing thermal energy is planned for installation at the ENEA-Casaccia centre (Italy). Costs, primary energy requirements, pollutant emissions and seasonal electricity consumption were estimated. The configuration based on four boreholes of different depths and the sizing of the vertical loop (double-U) were performed according to the ASHRAE method. This pilot plant, the first under construction within an Italian research centre, is part of a long-term research project funded by the Italian Ministry of Economic Development. The results of this research could be applied throughout the Italian Tyrrhenian Apennine margin, which is geologically characterised by highly conductive lithotypes. © 2021 Elsevier Ltd |
Notes | cited By 0 |
URL | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85106930764&doi=10.1016%2fj.renene.2021.05.083&partnerID=40&md5=29451b9d72b8a041024fb7932f94e585 |
DOI | 10.1016/j.renene.2021.05.083 |
Citation Key | Violante2021415 |